Product / Technical reports

NPC Work & Routine System — Development Reports

Download technical reports documenting development tests, measurements and their limitations.

NPC Work & Routine System — Baseline Population Stress Test (B1)

Our first baseline stress test examines how a persistent local-town-style simulation handles increasing NPC populations, from 24 to 1,000, while executing work routines, scheduling and basic navigation. The downloadable technical report documents the methodology, performance measurements, repeatability, supporting data and limitations of the tested configuration.

Download B1 Technical Report (ZIP)

Return to NPC Work & Routine System · Product support